3000A XL Wireless and Network Drag Timing System
The first fully redundant drag race timing system in the world — hardwired ethernet down the track and a wireless controller, running together.
Every system we sell is configured for the facility it runs at. Tell us about your track and we'll spec the right setup and price it, usually within one business day.
Request a QuoteSpecifications
| Redundancy | Fully redundant - dual data path |
| Network | Hardwired ethernet down the track |
| Wireless | Wireless controller |
| PC Required | Yes |
| Software | RA Command Drag (3128C) |
Features
- Fully redundant - hardwired ethernet and wireless running together
- Ethernet network down the length of the track
- Wireless controller on the same system
- No single data path to lose mid-event
- Pairs with the 3844AW ELITE Multi Link module
- PC race management via RA Command Drag
Description
Every other timing system on a drag strip has one data path. The 3000A has two: ethernet hardwired the length of the track, and a wireless controller running alongside it. Neither is a backup you switch to after something goes wrong — both are live, which is what makes this the first fully redundant drag race timing system in the world.
For a professional event, that changes what a fault costs. A cut cable, a damaged run, or a wireless path that goes marginal stops being the thing that holds up a round in front of a full grandstand and a broadcast window.
Pairs with the 3844AW ELITE Multi Link module for enhanced speed and ET measurement, and runs race management from RA Command Drag on a tower PC.
